previous arrow
next arrow

Spencer Two Zone Pressure System Project

Project Managers: Mario Romania
Engineer: Tata & Howard, Inc.
Client: Town of Spencer, Massachusetts
Construction Cost: $6,600,000
Construction Schedule: January 2010 - 2011

The work consists of the installation of approximately 9,700 linear feet of 12-inch diameter ductile iron water main, approximately 4,800 linear feet of 8-inch diameter ductile iron water main, manufactured booster pump station, and a 500,000 gallon partially buried cast-in-place concrete water storage tank. The project also involves the rehabilitation of three existing water booster stations, including mechanical and electrical upgrades.

en_USEnglish