Bulfinch Triangle District of Boston City Proper Drainage and Water Works Improvements for Installation of New Storm Drains, Sewers, and Water Main

Project Manager: Joseph Bettencourt
Engineer: Green International Affiliates, Inc.
Client: Boston Water and Sewer Commission for the City of Boston, Massachusetts
Construction Cost: $10,900,000
Construction Schedule: July 2008 - 2010

The scope of the project included the installation of approximately 6,100 linear feet of ductile iron cement-lined (DICL) pipe for the water main; 5,759 linear feet of 12-inch to 48-inch reinforced concrete pipe, ductile-iron pipe, and PVC pipe for sewer and storm drain; and 1,800 linear feet of a minor drain. The rehabilitation of 1,550 linear feet of combined sewer pipes was incorporated. Approximately 35 manholes, 1 special manhole, 6 catch basins and 1 drop inlet were furnished and set, and 18 hydrants and 60 water valves were set or reset.